• steel framed building

Re-clad and Closed off Building

January 9, 2016 / General

Re-clad and closed of between 3 buildings for the position of the biomass boiler, including a 6.1m x 6.1m concrete panel closure for the wood chip.

Why not call us today?

Get in touch with us and send some basic info for a quick quote.

Start a Project